Today I have a short layout update on installing the piping at Allied Chemical. This project actually took about four plus hours, laying out the remaining piping and all the separate valves and such. Then I had to measure some pieces and cut to fit, then of course glue everything together in rather tight quarters. Except for one set of steps going over the last berm I installed, I feel the Allied Chemical area is finished.
The area may not be an exact duplication of a prototype chemical plant, but I feel it’s a good representation of one for the space I have, and I feel it looks good. Photos below of today’s work:
Like this:
LikeLoading...
Published by stevecampbell60
I have been a railfan since the age of 6, and a modeler since the age of fourteen. This is my first fully (well not quite) completed model railroad. I fell in love with trains early in life, ride them when I can, have volunteered on many steam fan trips and have ridden many more steam excursion trips, have belonged to several model rr clubs, and did a stint as a brakeman/conductor on a midwest regional railroad. My layout was published in Model Railroader magazine in 2016. I hope all of you enjoy the ride here on my site!
View all posts by stevecampbell60