Yes, the last one, as-in last building that needed to go on the layout, is now complete and on the layout. These photos below show the finished work. All that’s needed is to glue down the gravel around the building. This is Electro-Met division of Union Carbide:
From the previous blog post, here are the switches for the two tortoise machines that were just installed. These control access in and out of Spring Street yard:
My next blog post I’ll post photos of the entire layout as it looks today…….
Like this:
LikeLoading...
Published by stevecampbell60
I have been a railfan since the age of 6, and a modeler since the age of fourteen. This is my first fully (well not quite) completed model railroad. I fell in love with trains early in life, ride them when I can, have volunteered on many steam fan trips and have ridden many more steam excursion trips, have belonged to several model rr clubs, and did a stint as a brakeman/conductor on a midwest regional railroad. My layout was published in Model Railroader magazine in 2016. I hope all of you enjoy the ride here on my sites! I now have the second blog/website up for my other hobby: wargaming with Flames Of War. I have been involved in wargaming off and on since my teens......
View all posts by stevecampbell60